
(Bentonite Type)

1. Auger a hole 1 metre deep and 100mm (4") in diameter in moist area
2. Place stainless steel rod in center of hole and drive 50mm into ground
3. Mix bentonite and salt and pour mixture into hole around rod
4. Top up hole with coarse sand or gravel. Water well
5. Connect s/steel rod to energiser and test earth. If inadequate install another earth kit 10 metres away.
* Home * Our Products *
* Helpful Hints
* Downloads
* Contact Us
* Company Profile
* Site Map *
Quality
Australian Made Products